1. Home
  2. Catalog
  3. Confetti SFX
  4. Shooting confetti
  5. Magic FX Stadium Shot III

Magic FX Stadium Shot III

VH-MFX0408
Starting price€225.00For 1–3 days rental · excl. VAT and delivery
  • Inspected and tested before every rental
  • Comes with its documentation: manual and certificates
  • Shipped from our 12,000 m³ warehouse in Affligem, Belgium
  • Reachable outside office hours too

Description

Massive output in one shot! The MAGIC FX STADIUMSHOT III is half the size of the famous STADIUMSHOT I and II and has the same output! This powerful confetti cannon is equipped with a low noise internal air compressor which saves even more space. DMX onboard and safely controllable by using the FX-ARM CONTROLLER.

Size: 60 cm x 40 cm x 87 cm
Weight: 88.5 kg
Voltage: 100-250 VAC
Power: 350 W
Control: DMX / Pyro 24 Vdc
DMX channels: 5
Output: Confetti max 20 m / streamers max 40 m
Consumables: Confetti or streamers

Technical data

Dimensions (L × W × H)60 × 40 × 87 cm
Weight90.8 kg
Power350 W
Runs onConfetti, Streamers
Mains frequency50–60 Hz
Power connectorNeutrik powerCON TRUE1 (in & out)
DMX channels2
DMX connectorNeutrik 5-pole XLR male/female
RDMANSI E1.20
RDMYes
ControlDMX512-A (ANSI E1.11) / 24 VDC pyro
Outdoor useYes
Article codeVH-MFX0408
Show all specifications (25 more)
Operating temperature-10 – 70 °C
Operating humidity20 – 90 %
Tilt protectionYes
Noise level>70 dB(A)
DMX enable address range1-512
DMX start address range1-512
Pyro input9-40 VDC
Pyro connector4 mm banana socket
Arm system requiredYes
Arm connectorNeutrik etherCON RJ45 (in & out)
Tank max pressure8 bar
Tank volume10.9 L
Onboard compressorYes
Max. compressor fill time2.5 min
Pressure range4–8 bar
Max. pressurized time15 min
Output pipe volume5 L
Effect distance confetti20 m
Effect distance streamers40 m
Safety zone directional confetti7 m
Safety zone directional streamers14 m
Safety zone radial2 m
Hearing protection distance5 m
DC power24 V
DC power12 W

New to dry hire? Read how dry hire works.

Magic FX Stadium Shot III€225.00 for 1–3 days